PHI · PHIUS · EnerPHit

Proof tracked from day one. No pulling apart walls.

PassiveTask scaffolds each project to its target standard, organizes every certificate and document to the checklist, and surfaces every gap in real time. The submission package is assembled as you build, not reconstructed at the end.

  1. Home
  2. En
  3. Solutions
  4. For Passive House
Close-up of a detailed architectural floor plan focusing on technical elements and design specifications.
The problem

Evidence missing at submission. Found too late.

The design was rigorous and the modelling was rigorous. Then the proof of what was actually built got assembled in a scramble weeks before submission. The performance was there. The proof was not.

Standards

Baked in, not sprinkled on. PHI · PHIUS · EnerPHit

Every checklist, evidence requirement, and submission format ships with the platform. No configuration project, no consultant onboarding fee.

StandardScopeStatus
PHI Classic / Plus / PremiumNew buildLive
PHI Low Energy BuildingNew buildLive
EnerPHitRetrofitLive
PHIUS CORE / ZERONew build & retrofitLive
LEED · WELL · Net ZeroBy requestOn roadmap
The workflow

One record, blueprint to certificate. Gated per stage.

Projects scaffold to your standard the day they open. Each stage gate closes only when its evidence is complete and verified, so the submission assembles continuously instead of retroactively.

  1. 1
    Closeout

    Submission generated

    A structured, certifier-ready package, assembled in minutes.

  2. 2
    Day 1

    Scaffolded to standard

    Pick PHI, PHIUS or EnerPHit; the full checklist and evidence schedule load automatically.

  3. 3
    Continuous

    Gaps assigned and closed

    Every missing or expiring document becomes a task with an owner and a review step.

  4. 4
    Per stage

    Phase gate cleared

    The project advances only when the prior stage's documentation is complete and verified.

Field evidence

Captured before close-up.

Geo-stamped and filed.

Airtightness details and insulation layers get photographed before the drywall hides them, then geo-stamped, tagged, and filed against the checklist item they evidence. OCR pulls U-values, lambda values, and expiry dates from component certificates, so a certificate expiring mid-build surfaces weeks early, not at submission.

Guided Field Capture with AI Tagging

Site photos are automatically tagged and linked to the relevant checklist item via Azure Vision. Geo-stamped. Filed automatically. No manual sorting, no lost evidence.

Offline-First Field ModeNew

Full PassiveTask functionality in the field with zero signal. Capture photos, update checklists, and log site observations — everything syncs silently and automatically when connectivity returns.

Performance Data Capture

Capture building performance data against the project record.

Expiry Alerts

Proactive alerts warn before certificates and documents expire.

Certification intelligence

Proof the certifier sees.

Mid-project, not after.

A live compliance dashboard, a read-only certifier link, and phase-gated evidence captured as it happened.

Certification Intelligence Engine

Projects are scaffolded to the exact requirements of PHI, PHIUS, or EnerPHit from day one. Azure AI monitors the compliance record continuously and surfaces gaps before they become problems at submission.

Real-Time Compliance Dashboard

A live certification readiness scorecard for every project. Share a read-only link with your certifier at any stage. Expiry alerts surface weeks before they become emergencies.

Certifier Share Link

A read-only share link lets the certifier engage mid-project as a single source of truth.

Phase Gating

Build phases are blocked from being logged as started until the prior phase's documentation is signed off.

Multi-Standard Support

Supports multiple certification standards (Passive House / PHIUS today, with LEED, WELL, and Net Zero on the roadmap), and a single project record can serve as evidence for overlapping certification bodies at once.

Smart Document Ingestion & OCR

Drop any file — product certificate, test report, specification sheet — and Azure Document Intelligence extracts U-values, lambda values, and expiry dates, routing the document to the right checklist item automatically.

Passive House FAQ

Certification questions, answered. answered.

Certify without the scramble. See it scaffolded.

Book a demo and we'll scaffold a project to your standard, live.